USML set up its first unit at Libberheri, Tehsil Roorkee, District Haridwar, Uttarakhand in 2000-01 for manufacturing sugar using Double Sulphitation (DS) process with a capacity of 2,500 TCD along with co-generation facilities of 6 MW of power. The company commenced commercial production on January 12, 2001. In subsequent years, the capacity of the plant was enhanced in phases to 6,250 TCD and power generation facility to 17 MW by 2004, which was subsequently enhanced to 23 MW in FY 2009-10. The unit has signed Power Purchase Agreement (PPA) with Uttarakhand Power Corporation Limited (UPCL) for export of 13 MW surplus power. Balance capacity is utilised for captive consumption.

The company also implemented process up-gradation by installing “Defeco Remelt Phospho Floatation Process” (DRP) along with Ion exchange to manufacture premium quality refined sugar of International standard with no sulphur content. The sugar unit is well connected by rail as well as road to the nearest major market of Roorkee. The region is situated in the Gangetic Plain which has ample water supply due to the high water table.

The sugar mill at Barkatpur is located in the Tehsil - Nazibabad, District - Bijnor (Uttar Pradesh). It was commissioned in January 2006 with a capacity of 3,500 TCD and since then has been expanded to the present crushing capacity of 7,000 TCD and power generation facilities of 40 MW, out of which 15 MW capacity was added on March 31, 2012. The plant was capable to generate surplus power but could not evacuate it, even though PPA was signed with Paschimanchal Vidyut Vitran Nigam Limited (PVVNL), as the transmission line for power evacuation was not ready. Now, the transmission line has been completed and the company has started exporting 26 MW surplus power with effect from April 2012.

Ethanol plant has also commenced operations from July 2012 which has installed capacity of 75 Kilo Litres per Day (KLPD).

The plant is ideally located with respect to the availability of raw material, water, skilled and unskilled manpower and infrastructural facilities. The site is around 27 Km from Bijnor city. The nearest railway station and town is Chandak which is about 5 km from the Plant. The site is at a distance of 12 Km from NH 74.

The company set up the sugar mill to manufacture premium quality white sugar using Defeco melt Process with an installed capacity of 4,500 TCD along with power generation capacity of 15 MW at village Khaikheri, Dist. Muzaffarnagar, Uttar Pradesh which commenced production in January 2007. The plant is around 25 Km from the main city and the nearest railway station of Muzaffarnagar. The Plant is located at a distance of about 4 Km from NH 58. The Arial distance of the plant is 16 km from the company’s Libberheri unit (Tehsil Roorkee) and 80 km from Bijnor. The unit has signed PPA with PVVNL (a unit of UPPCL) for export of 6.5 MW surplus power. Balance capacity is utilised for captive consumption.s

The company has set up the sugar mill to manufacture premium quality white sugar using Defeco melt Process with installed capacity of 6,000 TCD along with power generation capacity of 25 MW at village Shermau, Dist. Saharanpur, Uttar Pradesh which commenced production in April 2007. The site is around 40 Km from the main city and the nearest railway station of Saharanpur. The unit has signed PPA with PVVNL (a unit of UPPCL) for export of 10 MW of surplus power. Balance capacity is utilised for captive consumption.

Presently, Company’s facilities at Libberheri, Barkatpur , Shermau and Khaikheri have total crushing capacity of 23,750 TCD alongwith surplus exportable power capacity of 55.5 MW and distillery to manufacture 75 KLPD of Ethanol.